| 
Pose tended ceilings Clipso
|

|
|
|
|
Levelling :
Once the frames have been fixed, stretch a length
of string from the groove of one frame
to the other using the Clipso spatula (figure 10).
|
|
|
|
|
Installing accessories :
Fix the various accessories (spotlight fittings,
trap doors, spacing blocks, …) level with the
string.
|
|
 |
|
|
Trap doors, roof lights :
•Using wooden laths, bring the outline of the
roof light or trap door into line with the strings
`
(figure 11).
|
|
|
|
|
|
•Position the covering material.
• Cut out the covering material, leaving a margin
(10 cm)
on the inside of the frame created (figure 12).
|

|
|
|
|
• Carefully nick the covering material in the
corners,
then staple the covering material inside the frame.
Hide the staples using a flat finishing strip (wood
or PVC).
|

|
|
|
|